EV Battery · Clean Room
Seamless ISO Clean Room Flooring for Laval Facilities
Battery production and sealed-process manufacturing demand floors that do not shed particles, do not release chemical vapors, and do not interfere with the controlled airflow the room depends on. Laval Concrete pours and finishes seamless concrete systems engineered for ISO clean room specifications, with low-particulate materials, verified off-gas chemistry, and grounding where ESD control is required. Free written estimate on every project.
- Seamless, particle-verified install
- Low off-gas chemistry certified
- ESD grounding where required
Particle control
Why Seamless Flooring Matters in Clean Rooms
ISO clean room ratings depend on particle count per cubic meter. Every surface in the room contributes to or subtracts from that budget. Standard concrete sheds microscopic particles under foot traffic and equipment movement; a sealed seamless floor system traps those particles and keeps the room's ISO classification intact.
We specify smooth seamless epoxy or urethane systems matched to your ISO class, with chemistry that does not off-gas at operating temperature and grounding resistance for ESD-sensitive zones. The installation follows clean room protocols: contained prep work, HEPA filtration where needed, sealed transitions at walls and penetrations, and post-cure particle verification before handoff.
Our ESD flooring work in adjacent production areas coordinates with clean room boundaries. We also handle battery manufacturing flooring in non-clean zones and ready mix concrete for structural pours in the same facility.
Installation sequence
How We Build Clean Room Floors in Laval
-
Determine ISO class and material spec
We identify the target ISO class, the particle budget the floor contributes to, any ESD or grounding requirements, and the material chemistry that meets your process off-gas limits.
-
Prepare slab in controlled conditions
The concrete slab is prepped using contained or HEPA-filtered methods to avoid contaminating adjacent spaces, ground to the system profile, and any cracks filled with clean-room-rated repair materials.
-
Apply seamless system
The smooth seamless coating is applied without seams or joints across the room footprint, with the topcoat formulated to meet the off-gas and particle-shed specifications your process requires.
-
Test and document
After cure, particle count testing confirms the floor meets the ISO budget, ESD resistance is verified where required, and all certification documents are prepared for clean room commissioning.
Critical detail
Room Boundaries: Where Clean Room Floors Fail
The floor's seamless integrity fails at transitions. Doorways, wall-floor junctions, pipe penetrations, and equipment footings are where particle leakage occurs if not detailed correctly. We seal every transition with seamless cove, sealed penetrations, and integrated door frames so the floor's clean boundary holds across the entire room perimeter.
Coordinate with chemical-resistant flooring in adjacent production zones and with freezer floor systems if your facility includes temperature-controlled areas that share the clean room boundary.
Related EV battery services
Explore Other EV Battery Flooring Options
Clean room is one of two EV battery services we offer. See the other.
Common questions
Clean Room Floor Questions, Answered
ISO class, particle budget, off-gas chemistry and transition details.
ISO-class verified at commissioning with our floor as part of the particle budget. Hit class, room ran first try. The seamless transition detail at the door made the difference.
Off-gas verification on the floor chemistry for our sensitive process. No detectable contamination at the production analytical limit. Spec matched the process requirement exactly.
Multiple clean rooms across our facility, each at different ISO classes. They specced per room rather than one system everywhere; class targets hit in every room first commissioning.
Documentation package supported the validation file. Material specs, install method, particle verification all included. Auditor signed off without revisions.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Laval.
Ready to start
Get a Free Clean Room Floor Quote
Provide the ISO class, room dimensions, and your commissioning timeline, and we will specify the matched system and deliver a written quote.
We'll assess the clean room and send a written quote within one business day.