Driveways & Patios
Floors & Foundations
Floors & Flatwork
Sites & Facilities
Floors & Coatings
Facilities We Serve
Manufacturing · ESD
Static Charge Stops at ESD Flooring in Laval
When sensitive electronics sit on a factory floor, one static spark can mean a failed component and a production loss. An ESD-dissipative concrete floor absorbs charge from workers, carts, and equipment, then safely routes it to ground before it reaches the assembly line. Laval Concrete designs and installs these systems to your ANSI/ESD spec, grounds them to your building electrical, and verifies the resistance with a megohmmeter before handoff.
- Resistance verified post-install
- Grounded to building electrical
- Free written estimate, firm schedule
The ESD requirement
Why Static Dissipation Matters in Manufacturing
A conductive floor is not the same as a dissipative floor. Conductive means electricity flows too fast and can create electrical hazards. Insulating means charge builds up and never leaves. Dissipative is the engineered middle ground: charge flows to ground at a controlled rate, safe for both the equipment and the people working on the slab.
We install ESD systems matched to your facility's ANSI/ESD standard, with the right conductive loading (carbon black, conductive aggregate) to land in the target resistance window. After the epoxy cures, we test across multiple points with a megohmmeter and hand you the verified documentation. That report is what your auditor wants to see.
Our heavy-duty manufacturing floors and chemical-resistant epoxy systems work alongside ESD zones in the same facility. For clean room ESD work, see our EV battery clean room flooring page.
Installation sequence
How ESD Flooring Gets Built in Laval
-
Spec the standard and zones
We review your ANSI/ESD standard (electronics, clean room, pharmaceutical each have their own), identify which zones need dissipative coverage, and confirm the target resistance range and grounding scheme with your engineering team.
-
Prep and ground installation
The concrete slab is diamond-ground to the epoxy system's profile. Copper ground strips are set at the engineered spacing, then connected to the building electrical ground at designated points by the electrical contractor.
-
Apply ESD epoxy system
The matched ESD-dissipative epoxy (primer, body coat, topcoat) is applied with conductive elements at the right loading to achieve the target resistance range. The system cures per the manufacturer's schedule.
-
Test and document
After cure, the floor is tested at multiple points with a megohmmeter. Resistance readings are recorded for each zone, compiled into a verification report, and handed to you for compliance records and future audits.
The proof is in the test
Megohmmeter Verification Confirms the System Works
An ESD floor that looks right but fails the resistance test is worse than no ESD floor at all. It creates a false sense of protection while static charge still reaches your components. That is why we never hand off an ESD installation without megohmmeter verification across the finished slab at multiple test points, with documented readings that fall within your ANSI/ESD spec.
The verification report becomes part of your facility's compliance file. When an auditor or customer asks for proof that your ESD zones are protected, you have the data. We also coordinate with your electrical contractor on the grounding connections and with adjacent dust-proof sealing or warehouse floor coating in non-ESD areas so each system performs in its zone.
Related manufacturing services
ESD Pairs With Other Manufacturing Floors
ESD is one of four specialized manufacturing floor systems we install. See the others.
Heavy-Duty Concrete Floors
Impact-resistant manufacturing floor systems engineered for heavy machinery and equipment.
Learn moreChemical-Resistant Flooring
Urethane and specialty epoxy rated for industrial chemical exposure and spill containment.
Learn moreDust-Proof Concrete Sealing
Densifier and sealer systems that lock down concrete dust for cleaner manufacturing zones.
Learn moreCommon questions
ESD Flooring Questions, Answered
Resistance ranges, grounding, verification and which manufacturing zones need ESD.
ESD floor installed and verified across our assembly zone. Resistance documentation supported our customer compliance audit. The system has held for two years of daily operation.
They knew the ANSI/ESD spec cold, coordinated with our electrical contractor on grounding, verified with the megohmmeter at handoff. No improvisation, no audit findings.
Stricter clean room ESD spec, they hit it. Documentation, grounding, verification all in order. The auditor specifically called out the install quality.
Phased ESD install during off-shifts so production never stopped. Each zone verified before reopening, no resistance drift between zones. Real coordination.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Laval.
Ready to start
Get a Free ESD Floor Quote
Tell us the ANSI/ESD standard you operate under, the zones requiring coverage, and your operating schedule, and we will spec and quote the install with verification documentation.
We'll assess the facility and send a written quote within one business day.