Skip to main content
Laval & area concrete contractor · Free written estimates
(450) 233-4954

Manufacturing · ESD

Static Charge Stops at ESD Flooring in Laval

When sensitive electronics sit on a factory floor, one static spark can mean a failed component and a production loss. An ESD-dissipative concrete floor absorbs charge from workers, carts, and equipment, then safely routes it to ground before it reaches the assembly line. Laval Concrete designs and installs these systems to your ANSI/ESD spec, grounds them to your building electrical, and verifies the resistance with a megohmmeter before handoff.

  • Resistance verified post-install
  • Grounded to building electrical
  • Free written estimate, firm schedule

The ESD requirement

Why Static Dissipation Matters in Manufacturing

A conductive floor is not the same as a dissipative floor. Conductive means electricity flows too fast and can create electrical hazards. Insulating means charge builds up and never leaves. Dissipative is the engineered middle ground: charge flows to ground at a controlled rate, safe for both the equipment and the people working on the slab.

We install ESD systems matched to your facility's ANSI/ESD standard, with the right conductive loading (carbon black, conductive aggregate) to land in the target resistance window. After the epoxy cures, we test across multiple points with a megohmmeter and hand you the verified documentation. That report is what your auditor wants to see.

Our heavy-duty manufacturing floors and chemical-resistant epoxy systems work alongside ESD zones in the same facility. For clean room ESD work, see our EV battery clean room flooring page.

Recent work
ESD-dissipative epoxy floor in a Laval electronics assembly facility
Copper ground strip installation during ESD floor prep

Installation sequence

How ESD Flooring Gets Built in Laval

  1. Spec the standard and zones

    We review your ANSI/ESD standard (electronics, clean room, pharmaceutical each have their own), identify which zones need dissipative coverage, and confirm the target resistance range and grounding scheme with your engineering team.

  2. Prep and ground installation

    The concrete slab is diamond-ground to the epoxy system's profile. Copper ground strips are set at the engineered spacing, then connected to the building electrical ground at designated points by the electrical contractor.

  3. Apply ESD epoxy system

    The matched ESD-dissipative epoxy (primer, body coat, topcoat) is applied with conductive elements at the right loading to achieve the target resistance range. The system cures per the manufacturer's schedule.

  4. Test and document

    After cure, the floor is tested at multiple points with a megohmmeter. Resistance readings are recorded for each zone, compiled into a verification report, and handed to you for compliance records and future audits.

The proof is in the test

Megohmmeter Verification Confirms the System Works

An ESD floor that looks right but fails the resistance test is worse than no ESD floor at all. It creates a false sense of protection while static charge still reaches your components. That is why we never hand off an ESD installation without megohmmeter verification across the finished slab at multiple test points, with documented readings that fall within your ANSI/ESD spec.

The verification report becomes part of your facility's compliance file. When an auditor or customer asks for proof that your ESD zones are protected, you have the data. We also coordinate with your electrical contractor on the grounding connections and with adjacent dust-proof sealing or warehouse floor coating in non-ESD areas so each system performs in its zone.

Quote ESD flooring
Megohmmeter testing ESD floor resistance after installation
Verified Resistance range
Grounded To building electrical
Free Written estimate

Common questions

ESD Flooring Questions, Answered

Resistance ranges, grounding, verification and which manufacturing zones need ESD.

With a megohmmeter (high-resistance ohmmeter) at multiple test points across the floor, comparing to the ANSI/ESD standard's specified range. The reading needs to fall inside the dissipative window, not too low (conductive) or too high (insulating).
Only zones where ESD-sensitive components are handled. Electronics assembly, clean rooms, repair benches, certain pharmaceutical processes. The rest of the facility uses standard manufacturing flooring. We define the zones with you and your safety/engineering team.
Copper ground strips embedded in the floor at the engineered spacing connect to the building electrical ground at designated points. The electrical contractor coordinates with us on the connections and verifies the grounding scheme.
Many years with proper maintenance. ESD-compatible cleaning chemicals preserve the system; standard wax or solvent-based cleaners can compromise the resistance range. The maintenance protocol is part of project handoff and includes recertification cadence.
Similar to other epoxy systems plus the grounding install and verification steps. A typical zone takes a week to install and verify; multi-zone facilities stretch to several weeks with phased install. The schedule is in the quote.

Client reviews

What Laval Operations Say About Their ESD Floors

★★★★★ 4.9 · 87 reviews on Google
Read all reviews →
★★★★★

ESD floor installed and verified across our assembly zone. Resistance documentation supported our customer compliance audit. The system has held for two years of daily operation.

Z. X4
Electronics Plant Manager, Laval
★★★★★

They knew the ANSI/ESD spec cold, coordinated with our electrical contractor on grounding, verified with the megohmmeter at handoff. No improvisation, no audit findings.

Y. X4
Production Engineer, Montreal
★★★★★

Stricter clean room ESD spec, they hit it. Documentation, grounding, verification all in order. The auditor specifically called out the install quality.

Q. X4
Clean Room Operations, Terrebonne
★★★★★

Phased ESD install during off-shifts so production never stopped. Each zone verified before reopening, no resistance drift between zones. Real coordination.

X. X4
Manufacturing Director, Longueuil

Ready to start

Get a Free ESD Floor Quote

Tell us the ANSI/ESD standard you operate under, the zones requiring coverage, and your operating schedule, and we will spec and quote the install with verification documentation.

We'll assess the facility and send a written quote within one business day.