When demo opens up the basement floor, the concrete side of the reno becomes real. A new bathroom needs the slab cut and drained. A wall removal leaves a footing footprint to fill. Plumbing reroutes require clean trench closure. Laval Concrete handles the slab portion, coordinating with your renovator so the floor stays level and ready. Free written estimate on every project.

  • Saw-cut edges, no slab damage
  • Matched elevation and finish
  • Scheduled with your reno timeline

The slab side of renovation

Why Basement Renovation Concrete Matters

Every basement reno touches the slab. A new bathroom means cutting the floor, setting the drain, and closing the slab back up level. Removing a load-bearing wall leaves a footing footprint that has to be filled and finished. Rerouted plumbing requires trenches to be excavated, inspected, and poured back cleanly. Demo sometimes finds rotted concrete around old leaks that needs to be cut out and replaced. The slab work is the backbone of the reno, and it has to be done right or the rest of the project sits waiting.

General contractors and renovators know the slab piece is critical but it is not their specialty. We come in for that phase, usually a few days to a week, and leave the floor closed, flat and ready for the trades above. The reno keeps moving because the concrete work is sequenced correctly from the start.

We walk the project with the renovator and any plumbing or electrical trades before we start, so we understand the full scope. We coordinate timing with basement waterproofing if that is part of the upgrade, and we tie into any new basement slab work if the reno includes a full floor replacement.

Recent work
basement slab saw-cut and re-poured around a new bath drain
finished pour-back trench in a basement renovation in Laval

The sequence

How Slab Work Fits Into Your Reno

  1. Site walk with all trades

    We meet with the renovator, plumber, and electrician to identify every slab cut, confirm depths and elevations, and lock the sequence so concrete work fits the reno schedule without delays.

  2. Saw-cut and excavate

    Using a concrete saw, we make straight cuts at the required depth, keeping the existing slab intact. The trench is excavated cleanly, and the area is prepped for the new work.

  3. Plumbing and electrical run

    The new drain, water line, or electrical conduit is installed inside the trench, inspected where required, and the base is prepared with stone or backfill before pouring.

  4. Pour and finish

    Fresh concrete is poured into the trench or patch, finished to match the existing slab elevation and texture, and left ready for the rest of the reno to continue above.

Timing is everything

How Scheduling Keeps Your Reno on Track

Renos slip when one trade waits on another. The concrete work in a basement renovation is typically a 2-to-5-day job inside a 6-to-12-week project, but only if it is brought in at the right moment. We schedule with the renovator, hold the date, and arrive with the saw and mix ready to go.

Most of our reno calls come from general contractors and renovators who book us repeatedly for the slab piece. Some come directly from homeowners managing their own reno. Either way, we coordinate to the rest of the schedule, including any tie-in to a basement crack repair or a walkout basement upgrade that may be part of the same project.

Slot us into the reno schedule
basement renovation with concrete and plumbing trades coordinated on site
Coordinated With your renovator
Matched Slab elevation
Free Written estimate

Common questions

Basement Renovation Concrete Questions, Answered

Saw-cut slabs, bath drains, pour-backs, schedules and coordinating with your renovator.

Both. Many of our basement renovation calls come from renovators who use us repeatedly for the slab piece, but we also work directly with homeowners running their own project. We coordinate the same way either path.
Yes. We use a concrete saw to make straight, clean cuts at the required depth, which keeps the existing slab intact and gives us a square edge to pour back to. Hammer-and-chisel demolition of a slab edge is what causes the spalling people remember; we do not work that way.
Most concrete reno work runs a few days, sometimes a week if multiple pour-backs are involved. We schedule it as a contiguous block so the slab is open for the shortest time the trades need, then closed cleanly.
Yes. We pour to the same elevation and finish texture, so the patched area blends with the surrounding slab. If the finish above it is going to be tile or plank, exact match is not critical because the finish covers it; for exposed or polished slabs we put more effort into matching.
Not if it is sequenced correctly. The most common timeline slip is when concrete work is brought in late and trades have to wait on a cure. Brought in at the right point and the slab cure is happening while other work continues; the reno keeps moving.

Homeowner reviews

What Laval Homeowners Say About Their Basement Renovation Concrete

★★★★★ 4.9 · 87 reviews on Google
Read all reviews →
★★★★★

Mid-reno, our renovator brought in Laval Concrete for the bath drain pour-back. In, out, perfect match to the existing slab. Renovator booked them on his next project the same week.

V. N.
Laval
★★★★★

Took out a load-bearing partition and the existing footing footprint had to go. They cut, removed and poured back over two days. Renovation never paused. Worth the coordination cost.

U. D.
Montreal
★★★★★

They walked the whole reno with our contractor day one, identified two slab cuts we had not planned for, and the rest of the project never had a slab surprise. Anticipation is worth real money.

W. Q.
Longueuil
★★★★★

Found old rotted slab around a long-leaking joint during demo. They told us straight, cut it out, fixed the cause, poured it back. Honest assessment, clean work, no upsell.

Z. O.
Terrebonne

Ready to start

Get a Free Renovation Concrete Estimate

Tell us what the basement reno involves, what is being moved, added or cut, and we will quote the concrete portion in writing after a free walk-through with you or your renovator.

We'll walk the reno and send a written quote within one business day.