Driveways & Patios
Floors & Foundations
Floors & Flatwork
Sites & Facilities
Floors & Coatings
Facilities We Serve
BASF · MasterTop
Industrial Floors Built with BASF MasterTop in Laval
When a warehouse, manufacturing plant, or food facility needs a floor coating that performs under real-world stress, MasterTop delivers. Laval Concrete applies the full BASF MasterTop range, from standard epoxy for moderate traffic to urethane cement for chemical and thermal extremes. Every installation follows BASF spec, which is how the system warranty becomes real.
- Full BASF MasterTop range
- BASF-spec installation protocol
- Free written estimate with timeline
System selection
Choosing the Right MasterTop Coating for Your Facility
Not every floor needs the same coating. A distribution center with steady forklift traffic has different demands than a food processing plant with washdown cycles and chemical exposure. MasterTop spans the range: standard epoxy for light-to-moderate use, high-build epoxy for heavy traffic, urethane cement for severe chemical or thermal conditions, and decorative systems for retail showrooms. The slab itself also matters, moisture, existing damage, and substrate prep all factor into which MasterTop formulation will perform.
We start by assessing the actual facility conditions: what moves across the floor, what spills on it, temperature swings, humidity, slip requirements, and any regulatory compliance needs. From that assessment, we recommend the matched MasterTop system and walk through the prep and install timeline.
Our chemical-resistant flooring work often pairs with MasterTop, and we coordinate with MasterSeal waterproofing when substrate moisture is a concern. See our full BASF service lineup and broader warehouse floor capabilities.
Installation sequence
How MasterTop Installation Unfolds in Laval
-
Assess facility and select system
We evaluate traffic patterns, chemical exposure, thermal cycling, slip requirements, and any regulatory needs. From that, we select the matched MasterTop system and confirm the install schedule.
-
Prepare the slab to spec
The concrete is diamond-ground to the BASF profile, contaminants and old coatings removed, cracks repaired with BASF-compatible materials, and the surface primed with the matched MasterTop primer.
-
Apply MasterTop in layers
The system is applied in sequence: primer, body coat, aggregate broadcast where specified, topcoat at engineered thickness. Each layer cures per BASF spec before the next is applied.
-
Document and hand off
The install is documented with material specs, batch records, and cure schedule. The floor is handed off with maintenance protocol and BASF system warranty paperwork in your file.
Why BASF spec matters
System Warranty Depends on BASF-Spec Installation
MasterTop system warranty is not a product warranty. It is a system warranty that covers the entire installation, prep, primer, application thickness, cure schedule, and topcoat. When we install to BASF spec, the warranty extends to install integrity. Substituting components, mixing off-ratio, or skipping prep steps voids the warranty. That is why we follow the protocol exactly.
Coordinate with our food-grade epoxy work and broader industrial concrete services. See how MasterFlow grout fits into equipment pad work on the same project.
Related BASF products
Pair MasterTop with Other BASF Systems
MasterTop is one of three BASF services we offer. Explore the others.
Common questions
MasterTop Questions, Answered
System range, facility match, warranty and BASF spec compliance.
MasterTop urethane cement in our chemical exposure zone. Three years of operation, no degradation, BASF warranty in our file. The brand discipline pays off.
High-build MasterTop across our warehouse zones. Forklift traffic for two years, no spalling at the joints, no surface wear. Right system for the use.
BASF-spec install with documentation. The system warranty paperwork came at handoff, supporting our facility records and any future audit need.
They matched the MasterTop system per zone in our multi-use facility instead of one system everywhere. Better outcomes, smaller total cost. Real engineering match.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Laval.
Ready to specify
Get Your MasterTop System Quote
Share your facility type, zone layout, and any special requirements. We will spec the matched MasterTop system and send a written quote with timeline.
We'll assess and send a written quote within one business day.