Skip to main content
Laval & area concrete contractor · Free written estimates
(450) 233-4954

Aircraft Hangars · Floor Coating

Laval Hangar Floor Coating Built for Aviation

Hangar floors must survive exposures that no warehouse or manufacturing floor encounters. Jet fuel, Skydrol hydraulic fluid, de-icing chemicals, and concentrated tow tractor loads demand a coating system engineered specifically for aviation. Laval Concrete installs urethane and aviation-spec epoxy floors rated for all of it. Free written estimate on every project.

  • Skydrol and fuel-rated systems
  • Tow tractor load engineered
  • Free written estimate, firm schedule

Chemical exposure

Why Aviation Hangar Floors Require Custom Specs

Skydrol hydraulic fluid is the primary driver. It chemically attacks standard epoxy coatings and causes rapid failure. Jet fuel and avgas add their own degradation pathways. Winter de-icing fluids introduce glycol-based chemistry that compounds the problem. A single coating system must resist all three simultaneously, which is why off-the-shelf warehouse epoxy fails in hangars.

Load patterns differ too. Aircraft sit parked with weight concentrated at gear points. Tow tractors that move aircraft in and out create small hard wheels that concentrate load like a forklift, often at the worst possible angles. The slab and coating must handle both static aircraft loads and dynamic tow tractor movement without cracking or delaminating.

Our approach starts with a chemical exposure audit. We confirm which fluids the hangar handles, the spill frequency, and the cleanup protocols, then spec a matched system. See our broader aircraft hangar services and chemical-resistant flooring work. Apron and taxiway concrete outside the hangar door is a separate specification.

Recent work
aircraft hangar floor coating in Laval
finished hangar floor with aircraft parked on coated surface

Installation sequence

How Hangar Floor Coating Gets Installed in Laval

  1. Audit chemical exposure

    We meet with maintenance and operations to document every fluid the hangar handles, spill frequency, cleanup methods, and any prior damage. This drives the system spec and prep strategy.

  2. Grind and remediate slab

    The concrete slab is diamond-ground to the coating's prep profile. Any zones contaminated by prior fuel or hydraulic spills are remediated, sometimes requiring removal and replacement. Cracks are repaired with high-strength bonded materials.

  3. Apply aviation-rated coating

    The matched system (urethane cement for Skydrol-heavy exposure, aviation-spec epoxy for general use) is applied at engineered thickness. Slip-resistant aggregate is broadcast into service areas where traction matters.

  4. Fill joints and document

    Control joints are filled with chemical-resistant semi-rigid filler rated for the same fluids the coating handles. The topcoat seals the system. Chemical-resistance documentation is provided for facility compliance files.

Load engineering

Tow Tractor Loads Are Often the Worst Case

Aircraft weight is distributed across multiple landing gear points, which spreads the load. A tow tractor pulling or pushing the aircraft concentrates force through small hard wheels, creating point loads similar to a forklift. At every turn or directional change, the tractor wheels dig into the floor. We engineer the coating and slab for tow tractor loads as the design case, which means the floor easily handles the lighter distributed aircraft loads.

Coordinate with apron and taxiway work outside the hangar and with the full suite of aircraft hangar services across your facility.

Quote a hangar floor
aircraft tow tractor on hangar floor coating in Laval
Spec-matched Aviation chemistry
Tow-rated Point loads
Free Written estimate

Common questions

Hangar Floor Coating Questions, Answered

Skydrol resistance, tow tractor loads, joint fillers and aviation compliance.

Aviation chemicals (especially Skydrol) attack standard epoxy systems aggressively. Combined with tow tractor point loads and aircraft tire contact patches, the spec has to match a unique exposure profile that other commercial floors do not see.
If the hangar handles aircraft with Skydrol hydraulic systems (most modern commercial and many corporate), yes. Skydrol-rated urethane cement is the typical answer; the wrong system dissolves quickly under Skydrol contact.
Glycol-based de-icing fluids are part of the chemical exposure profile in Laval hangars. We spec the system for those alongside the aviation hydraulics so winter operations do not degrade the floor.
Yes, the joint filler has to be chemical-resistant to the same aviation fluids the coating handles. Standard polyurea filler can degrade under Skydrol; we use chemical-resistant variants in aviation environments.
A typical hangar takes a week or two from prep through cure, with the hangar offline during the work. Larger MRO facilities stretch to multi-week phased installs. The schedule is built around maintenance operations.

Client reviews

What Laval Operations Say About Their Hangar Floors

★★★★★ 4.9 · 87 reviews on Google
Read all reviews →
★★★★★

Skydrol-rated urethane install in our maintenance hangar. Three years of regular hydraulic spills, zero coating failure at any spill point. Worth the spec premium over standard epoxy.

Z. A5
FBO Manager, Laval Airport
★★★★★

Engineered for our tow tractor loads, not just aircraft loads. The coating has held perfectly at every tow turn point, where the previous floor had failed within months.

Y. A5
MRO Operations, Montreal
★★★★★

Coordinated install during a scheduled maintenance downtime. Hangar offline only for the cure window, back in service on schedule. Real coordination with operations.

Q. A5
Corporate Hangar Owner, Terrebonne
★★★★★

Documented chemical-resistance rating for our facility compliance file. Auditor accepted without questions. The documentation matters in aviation.

X. A5
Aviation Facility Director, Longueuil

Ready to start

Get a Free Hangar Floor Quote

Tell us the aircraft type, chemical exposure profile, and operating schedule, and we will spec the matched aviation system and quote in writing.

We'll assess the hangar and send a written quote within one business day.